Project

Grants Ferry Parkway

Location

Brandon, Mississippi

Project Information

In January of 2014, Benchmark Engineering & Surveying, LLC was selected by the Grants Ferry Parkway, LLC to provide land surveying and civil engineering services for the surveying and design work required to prepare construction plans for the construction of a new major thoroughfare that will connect to Hwy 80 where the East Brandon Bypass is proposed to intersect and run northwesterly to Hwy 471.  The roadway will be a divided section and approximately 3.75 miles when fully complete.  The roadway will serve as an access road to connect East Brandon to Hwy 471 and will open up numerous acres for development.  The project is proposed to be done in phases at this point in time.  This is a major, multi-year project that is in its early stages but work has begun on this large scale project. Phases A & B have been constructed and the final Phase (Phase C) of this project has been designed, approved and was just completed in November 2022.

Project services

  • Boundary & Topographic Surveying
  • Right-of-way Plats & Descriptions
  • Roadway Design
  • Storm Drainage Design
  • Erosion Control Plan
  • Striping & Signage Plan
  • Traffic Control Plan
  • Coordinate Utility Relocates
  • Bid Document Preparation & Oversight
  • Construction Oversight

Project Images